01924 253509

Brighton Police Station - CLP Air Group

A new air handling unit and controls package was supplied to serve the custody suite. The unit was located in an internal plant room and the only access available was via single doorways and numerous tight corridors. All equipment was delivered, positioned and re-assembled by our site team.

As part of the AHU installation a wall mounted controls system was supplied and installed by our site team. We later returned to site to commission the controls system.

Contact us to learn more.